Building Conversion

The conversion of the coach house was relatively straightforward, but the conversion of the horseshoe building was more complex.

Whilst the distinctive tiled roof structure and the twin towers were retained, the rest of the building was extensively modified. The ground floor of the horseshoe building was lowered, and then extended into the inner courtyard by 5m, to increase the working area. Turf was planted on the roof of the new office space, providing attractive insulation. The upper level floor and the roof were reinforced, and the outer external wall rebuilt. A new single storey link, incorporating the main entrance, was built to connect between the two wings.

Site Layout
The triangular site comprises 7 ha of farmland located in the metropolitan green belt. The boundary of the site is formed, to the south, by the M25 orbital motorway; to the west, by the mainline London to Glasgow railway; and, to the north-east, by a private road. The egg farm is set out on an axis, which, if extended northwards, aligns with the Ovaltine factory - the destination of all the eggs laid on the old farm. The layout of the various elements comprising the development is shown on the site plan.

Take a tour of Beaufort Court...
click here